The Nave Wind Farm is located in the municipalities of Vila Nova de Paiva, Castro Daire and Moimenta da Beira, in the district of Viseu.
COORDINATES: 40.934294; -7.781485
COMMERCIAL OPERATION: 2007
INSTALLED CAPACITY: 38 MW
NUMBER OF TURBINES: 19 (2 MW/turbine)
MODEL / MANUFACTURER: G90 / Gamesa
The Nave Wind Farm, with an installed capacity of 38 MW, is located in Vila Nova à Coelheira, in the municipalities of Vila Nova de Paiva, Castro Daire and Moimenta da Beira, in the district of Viseu. It is composed of 19 Gamesa G90 wind turbines with a nominal capacity of 2 MW and began commercial operation in January 2007. The asset represented an investment of EUR 50 million.
The average annual production is estimated at 75,400 MWh which is approximately the electricity consumption of Vila Nova de Paiva, Castro Daire and Moimenta da Beira.